Tel: 0086-532-88966982
0086-532-88965892
Website: www.lidajituan.com
Email: sales@lidajituan.com
Head Office: 5th Floor,Building A,Darron Center,No.180,Haier Road,Qingdao, 266000,China
06 Project Zone Camp of First phase Civil engineering construction of NO.6 Qingdao Metro
- Time of issue:2023-02-08 11:40
06 Project Zone Camp of First phase Civil engineering construction of NO.6 Qingdao Metro
- Categories:Integrated Camp
- Author:
- Origin:
- Time of issue:2023-02-08 11:40
- Views:
Qingdao Metro Line 6 runs through the West Coast New District. It is the main line of public transportation in the central area of the new district, all of which are underground stations.The first stop of the first phase of the Metro Line 6 project is Xintun Road Station, and the end point is the Ecological Park Station. There are 21 stations with a total length of about 30 kilometers.In the future, Metro 6 will transfer to Metro 1, Metro 2 and other metros, and then people can freely travel between the East and North regions such as below picture.
The Camp 06 project of the first-phase civil engineering of Qingdao Metro No. 6 is located in Huangdao District, Qingdao City. It starts from Qiantang River Road, and runs along Chahe River Road, Fenjin Road, Songhua River Road, Tuanjie Road until Qianwangang Road.The construction includes two stations and three sections, that is, Qiantangjiang Road Station-Binhai College Station section, Binhai College Station, Binhai College Station-Qingyi West Hospital Station section and Qingyi West Hospital Station and Qingyi West Hospital Station-Gangtou Station section . The total length of the line is 4.46km.In particular, Binhai College Station will use ground excavation and underground excavation methods, and Qingyi West Hospital Station will use underground excavation methods to establish stations.A total of 3 double shield TBM tunneling construction is adopted in the section, with a TBM tunneling length of 6.38km.The total contract duration is 36 months.
The two stations and three sections of Qingdao Metro No. 6 are the Qianbin section, Binhai College Station, Binqing section, Qingyi Xiyuan District Station and Qinggang section.The 06 camp site project department of the first phase of Qingdao Metro 6 is located in the Hisense plot at the northwest corner of Qi Changcheng Road and Tuanjie Road (located in the middle of the project pipe section), covering an area of about 14,000 square meters.
In Qingdao, the era of subway transportation has come
The future Qingdao is really not to be underestimated
Give you a thumb-up if you choose Qingdao







▲Greening
A courtyard-type central garden is set in the center of the office area, and the field area is 100% hardened or planted with seedlings and grass.











Related Cases
Contact Us
Head Office: 5th Floor,Building A,Darron Center,No.180,Haier
Road,Qingdao, 266000,China
Tel: 0086-532-88966982 88965892 Fax:0086-532-88965571
Email: sales@lidajituan.com Website: www.lidajituan.com
Alternate Websit: www.prefabhousecn.com
Wechat/WhatsApp:+86-13793209022

Head Office: 5th Floor,Building A,Darron Center,No.180,Haier
Road,Qingdao, 266000,China
Tel: 0086-532-88966982 88965892 Fax:0086-532-88965571
Email: sales@lidajituan.com Website: www.lidajituan.com
Alternate Websit: www.prefabhousecn.com
Wechat/WhatsApp:+86-13793209022

Copyright(c)2020 All Rights Reserved
鲁ICP备15013265号 POWERED BY WWW.300.CN